The Lens Workstation Availability Manager (WAM) is responsible for scheduling when workstations are powered on and off. WAM is controlled by an easy-to-use calendar interface that allows administrators to control multiple workstation pools with a single calendar event. This article will explain how to create a new event.
Adding an event
-
Login to the Lens Portal
-
In the left sidebar expand the
Configurationmenu and select theWorkstationsoption -
Under the
Schedulingsection, select theCalendaroption -
Select the tab that corresponds with the day you would like the schedule item to run
The workstation scheduling calendar
-
Click the
Addbutton -
You will now see an
Add eventmodal appear
The Add eventmodal
-
In the
Operationdropdown field select the desired operation. For more information on workstation schedule operations see this article . -
Follow the instructions relevant to your desired operation type
Adding an event: Maintain availability
-
In the
Poolsfield, tick all the workstation pools you would like this event to control -
In the
Start timefield, enter the time that you would like this event to run from. -
In the
End timefield enter the time this event should stop running. After this time any workstations powered on will remain on, but no new workstations will be started. After this event finishes it is recommended to have an Inactive shutdown event to power off any unused workstations. -
In the
Timezonefield, select the timezone that this event should be run. For most use cases this should be the same timezone as where the workstations targeted are located. For example, if the workstations being controlled are in New York, USA then theAmerica/New_Yorkoption is most likely the best option. -
Specify the number of workstations you would like to be kept available in the
Availabile workstations requiredfield -
Click the
Add button
Adding an event: Self-serve
-
In the
Poolsfield, tick all the workstation pools you would like this event to control -
In the
Start timefield, enter the time that you would like this event to run from. -
In the
End timefield enter the time this event should stop running. After this time users will not be able to self-serve machines. -
In the
Timezonefield, select the timezone that this event should be run. For most use cases this should be the same timezone as where the workstations targeted are located. For example, if the workstations being controlled are in New York, USA then theAmerica/New_Yorkoption is most likely the best option. -
Click the
Add button
Adding an event: Start
-
In the
Poolsfield, tick all the workstation pools you would like this event to control -
In the
Start timefield, enter the time that you would like this event to run. This event will only run once at the defined time. -
In the
Timezonefield, select the timezone that this event should be run. For most use cases this should be the same timezone as where the workstations targeted are located. For example, if the workstations being controlled are in New York, USA then theAmerica/New_Yorkoption is most likely the best option. -
Specify the number of workstations you would like to start in the
Workstations to startfield. If you would like to start all workstations then check theApply to all workstations in pooltoggle. -
Click the
Add button
Adding an event: Stop
-
In the
Poolsfield, tick all the workstation pools you would like this event to control -
In the
Start timefield, enter the time that you would like this event to run. This event will only run once at the defined time. -
In the
Timezonefield, select the timezone that this event should be run. For most use cases this should be the same timezone as where the workstations targeted are located. For example, if the workstations being controlled are in New York, USA then theAmerica/New_Yorkoption is most likely the best option. -
Specify the number of workstations you would like to stop in the
Workstations to stopfield. If you would like to stop all workstations then check theApply to all workstations in pooltoggle. -
Click the
Add button
Adding an event: Inactive shutdown
-
In the
Poolsfield, tick all the workstation pools you would like this event to control -
In the
Start timefield, enter the time that you would like this event to run from. -
In the
End timefield enter the time this event should stop running. -
In the
Timezonefield, select the timezone that this event should be run. For most use cases this should be the same timezone as where the workstations targeted are located. For example, if the workstations being controlled are in New York, USA then theAmerica/New_Yorkoption is most likely the best option. -
Click the
Add button